ULTIMATE INSTALLATION SERVICE

We have in-house teams of experienced installers at all of our branches throughout New Zealand.

Our installation service is offered for our range of products including temporary surface protection, internal and exterior hoardings, vinyl graphics, sound control, ZipWall products and site essentials.
Companies are increasingly coming to rely on the expertise and service of our install teams to get projects completed efficiently and within budget.

 

CONTACT US TODAY FOR A QUOTE
Install for Fonterra
Warehouse Segregation Install
Armour Board Installation
Ultimate gets the job done...rain, hail or shine!
Printed Tightweave PVC mesh - Nelson Opera Event
Hygiene Clad Installation
Hoardfast Hoardings at Britomart
Saveboard in Use - Concrete Pillar Protection

Cost benefits

“Canam initially utilised the PVC Hoarding supplied and installed by Ultimate Solutions for our hospital and pharmaceutical projects where hygiene and clean rooms were required. It soon became evident that the PVC hoardings were an excellent option for perimeter hoardings to our sites. They provide a solid and secure barrier which is fast to install, easily modified, and requires minimum maintenance. We have definitely seen cost benefits with this system compared to traditional plywood hoarding and heras fencing which require a lot of maintenance. The hoardings are also kinder to the environment, being made from 85% recycled materials and the ability to be re-used over multiple projects. Ultimate Solutions even offer a buy back scheme at the end of the project and any panels that are reaching the end of their life are sent to be remanufactured into new panels.”

Stephen Jones / Canam Construction
Exterior Hoarding and Customised Graphics
Interior Cleanroom with Fastwall Premium and a Suspended Hygine Clad Ceiling
External Hoarding with Block and Brace Support System
SoundBuffer Noise Barrier System
Wellington City Council Custom Pool Area Protection

Clean, robust and professional solution

We were given the challenging task of partially demolishing a fully operational UHT milk factory whilst it was in full production. In order to achieve this we needed to encapsulate a large amount of plant and operational area for the client in order to protect the machinery and enable production staff to continue ‘as normal’

A solution was required that was going to be fast , efficient, versatile and cost effective to install , but also that met the requirements of a washable critical hygienic environment that was to be scrutinised by Assure Quality.

There was also the added challenge that some parts of the structure were to be opened up to the elements and also needed to keep the rain and snow out of the building.

Scaffolding with plastic wrap was considered however, this is not particularly robust and if changes were required would have involved 2 contractors and been cumbersome.

The decision was reached to utilise the Ultimate Solutions ‘fastwall’ system in conjunction with regular scaffolding, The scaffolding would act as a roof and working platform and the perimeter was wrapped with the ‘fastwall’ product to enclose.

This solution gave us an extremely robust containment area that was quick to erect. Doors for egress could be set into the system to give a clean egress into the containment zone.

In addition we also used some of the zip wall with telescopic poles on the west elevation to give us a soft spot where once the scaffolding / fastwall enclosure was complete we could break through into the critical hygiene part of the factory.

The client walked through the ‘enclosure solution’ with assured quality who asked us to foam up some minor holes and then gave the client the green light to continue production.

In the construction industry we continually are faced with challenging environments to control dust debris and site hazards, alongside traditional scaffolding these products enabled us to deliver true to our word and give the client confidence in a clean, robust and professional solution.

Tomlyn Campbell | Construction Site Manager / Apollo Projects Limited
Laboratory Partitioning using Fastwall Premium
Labworks - Otago University Wellington
Labworks - Otago University Wellington
Labworks - Otago University Wellington
Labworks - Otago University Wellington
Labworks - Otago University Wellington
Labworks - Otago University Wellington
Labworks - Otago University Wellington
Fastwall Premium Walls with Engineered Support Posts and a Hygine Clad suspended ceiling

Easier and lighter to manage

We will never use conventional hoarding again! Ultimate Solutions Hoarding is easier and lighter to manage, the prefinished surface is in-keeping with most clients requirements. The ability to reuse is great.

Graeme Smith | Construction Manager / HAWKINS CONSTRUCTION
Exterior Roof Protection using Recycled Rubber Matting, Flute and MDF

Recommended

For the past few years we have been using a variety construction protection systems supplied by Ultimate Solutions. In particular, two site hoarding systems have been ‘stand outs’ for both us and our clients

They each have their specialised use but they all have a common thread of: Fast Install, Strong, Reusable, Highly Presentable, Versatile & Sound Blocking.

We would recommend the use of these systems for any high profile & public hoarding requirement.

Stephen Romanos | Contracts Manager / Accent Construction Interiors Ltd
Sound enclosure tent with SoundBuffer Curtains on Aluminum Structure with caster wheels
HoardFence
Our temporary hoards are even trusted by Rolls Royce!

The range is fantastic

Due to the sensitive nature of the construction works being undertaken whilst the supermarket was still operating and the need to provide the highest standard of public protection, we turned to Ultimate Solutions, who provided us their Hoarding systems.

The range is fantastic, quick and easily erected, robust, flexible and looks clinical with sharp lines when installed.

We believe it to be very economical when compared against conventional hoardings.

Steve Gutteridge | Contract Manager / Watts & Hughes Construction Company
Fast Exterior Hoardings

I just wanted to drop a quick line to mention the outstanding work the installers did on my job! Good to know you have good installers, I’ll book through Ultimate again next time.

 

Project Manager / Edge Interiors
Office Partitions at Wellington Airport using the ultimate hoardfast systems
Hoardfence - Metlifecare Whangarei

METLIFE CARE | WHANGAREI

HOARDFENCE

HOARDFENCE SYSTEM

Rear view of hoard fence system

Security Strips
Security Fence Strips
Marquee Partitioning - America's Cup HQ